“Although the heating was supposed to be on it was very cold.”
The shower head was in the wrong position so extremely difficult not to swamp the rest of the bathroom. The hall flooring was very uneven. The scaffolding made the property very dark and even on the brightest day the light had to be switched on.
We are so sorry about the scaffold, wet weather and other delays meant it was up longer than planned. We are really pleased to say it has all now been taken down and we thank everyone for their patience.
The cold spell surprised us all, but once your heating is on, the thermastat in the hall can be turned up to whatever is comfortable for each guest.
We do hope if anyone has problems in future they realise that they can talk to us so that we can sort things out straight away.
All the best
David and Anna Parker, Owners
Property Owner